Drywall contractor software
Drywall is priced per board and per level of finish, and both get argued about. A job quoted at level four and inspected at level five is a loss that was baked in at the estimate. WorksiteBase makes the takeoff explicit — board count, finish level, ceiling height — so what was quoted is what was agreed, and the crew works to the same specification the customer signed.
- Level of finish agreed verbally and disputed at inspection
- Board counts estimated rather than measured
- Hang, tape and finish crews scheduled out of sequence
- Material delivered to the wrong floor or the wrong day
- Repair work mixed in with new construction on one invoice
Board count and finish level on the estimate
Both are stated explicitly, so the specification the customer signs is the specification the crew works to.
// Takeoff app
Takeoff · Interior repaint
Living room walls265 sq ft
Hallway walls132 sq ft
Ceiling156 sq ft
Total area553 sq ft
553 sq ft × $1.85/sq ft = $1,023.05
Two coats · low-VOC white
Estimate created
Crews in the right order
Hang, tape and finish sequence on one board with the dependencies visible, instead of three separate conversations.
// Job board · week of Jul 13
MonTueWedThuFri
North crewAlvarez · 3 techs
Reroof — 1420 Linden St. · 42 squares
South crewGarcia · 2 techs
Paver patio — Garcia residence
Deck build — Nguyen
East crewCramer · 2 techs
Roof replacement, Maple Way
1 job unassigned Thu/FriUtilization 84%
Material where it is needed
Deliveries book to the job with floor and stage, so board is not stacked where the crew is not.
// Materials · Electrical · Warehouse B
| Item | On hand | Reorder | Status |
|---|---|---|---|
| 12/2 NM-B wire, 250 ft | 3 rolls | 5 rolls | |
| EV charger, 48Aneeded for Miller job · arriving Thu | 0 units | 1 unit | |
| Breaker, 20A single-pole | 42 units | 20 units | |
| Wire duct 2"×2" | 12 sticks | 20 sticks |
3 items below reorder point
Common questions
- Can I price by level of finish?
- Yes, per level and per area within the same job.
- Does it handle repair work?
- Yes — small repairs run as their own jobs without dragging the construction schedule along.
- Can I track waste?
- Yes, per job, which is how you find out which crews are actually efficient.